Purpose and Scope: | This procedure describes the repair attempt process for leaking equipment found during the annual fugitive emissions survey. In addition, it outlines the process for quarterly pump and compressor seal monitoring. | | | Personal Protective Equipment (PPE) Required: | Normal mandatory PPE for working in process areas required. Additional PPE may be required as per Refinery Standards and applicable Material Safety Data Sheets (MSDS). | | | References: | LDAR – OLT SWP Initiating Procedure LDAR – Monitoring ProcedureLDAR – Repair Attempts Log in FEMS ProcedureLDAR – Work Notification Entry Procedure | | | * * * PREREQUISITENA | * | * PROCEDURE INSTRUCTIONS | 1.0 | Manage First …show more content…
| | | | * | | | 1.3 | * Send an email to the appropriate Maintenance and Operations Coordinators to make them aware of the notification that was entered. Provide them with the notification number and a brief description. | | | | * | | | | * NOTE * First attempt repairs involve the operator tightening the plug or packing of leaking equipment. This equipment will be tightened using various wrenches that operations uses. If the operator cannot attempt to fix a piece of equipment using their tools, they will note this on the repair schedule. Then you must move the equipment to the second attempt process. | | | | * | | | 1.5 | After Operations completes the first attempt repairs, each leak must be re-monitored. The EH&S Intern will print out a list of all of the leakers and enter a safe work permit (SWP) into the Operator Log Tool (OLT), using the “LDAR - OLT SWP Initiating Procedure” as a guide. | | | 1.6 | * Monitor all leaking points for fugitive emissions (after picking up your permit from the control room). Record all of the leak rates. If the leak rate is >10,000 ppm, remove the green car seal. | | | 1.7 | * Enter all of the monitoring data into FEMS. See “LDAR – Repair Attempts Log in FEMS.doc”. Also update the “Master List of Leakers” spreadsheet. | | | | * | | | | * NOTE * For the upcoming 2014 LDAR survey, first attempt

Related Documents